Growing for the Future - ATB Expansion Project
The Charlottetown Alexander B. Campbell Airport is in the middle of its most significant transformation in its history. The $44 million Air Terminal Building (ATB) Expansion is a multi-year investment in the future of air travel for Prince Edward Island. Expanding capacity, modernizing the passenger experience, and building an airport worthy of the Island it serves. From the first shovel in the ground to the final ribbon cutting, this page tells the full story of how we are growing for the future.
$44 Million
Total Investment
June 2027
Target Completion
3 Phases
of Construction
SableARC
Design Partner
Expansion Timeline
2019
Master Plan COMPLETE

2040 Airport Master Plan
Where it all began.
- In 2019, the Charlottetown Airport Authority completed a 2040 Airport Master Plan.
- The plan identified infrastructure improvements needed immediately and for future growth.
- It provided the framework for all expansion decisions that followed.
Master Plan COMPLETE
2022
November COMPLETE

Expansion Project Approved
After a 3-year pandemic delay, the CAA Board of Directors gave the green light.
- CAA Board approved the initiation of the ATB Expansion Project in November 2022.
- SableARC, a Charlottetown-based sustainable architecture firm, was awarded the design contract in January 2023.
- EllisDon named as general contractor.
November COMPLETE
2023
Summer COMPLETE

Phase 1a: The Dock Opens
Canada's first outdoor airport boarding lounge opens at YYG.
- The Dock opened in summer 2023 at a cost of $1.6 million.
- Canada's first outdoor airport boarding lounge — a first of its kind in the country.
- Features 200 seats, a licensed lounge, and tarmac views of the airfield.
- Colourful Muskoka chairs and open-air design reflect the warmth of Island summers.
Summer COMPLETE
2024
Fall COMPLETE

Phase 1b: Construction Begins on New Check-In Hall
The transformation of YYG's ground floor begins.
- Construction starts on the expanded check-in hall in fall 2024.
- Expansion allows for more counters and significantly more passenger space.
- Additional office, storage, and operational space created for airline and ground handler partners.
- CAA administration offices relocated and expanded to the second floor.
Fall COMPLETE
2026
Spring COMPLETE

Phase 1b: New Check-In Hall Opens
The most visible transformation yet — a new first impression for every traveller at YYG.
- The expanded check-in hall officially opens to the public.
- Features a stunning 1,400 square foot landscape photograph by local PEI photographer Brady McCloskey.
- The image depicts PEI's iconic red sand cliffs and coastline, greeting every traveller who walks through the doors.
- New check-in counters, improved passenger flow, and a modern, open feel throughout.
- New baggage handling system installed for airline partners.
Spring COMPLETE
2026
Summer IN PROGRESS

New Security Operations Centre (SOC) Opens
A new home for GardaWorld Security — keeping YYG safe and connected.
- New Security Operations Centre (SOC) opens within the terminal.
- GardaWorld Security staff available to assist all passengers during their travels.
- The SOC serves as the command centre for all security operations at YYG.
- Passengers can visit the SOC booth for assistance, lost and found inquiries, and general support.
Summer IN PROGRESS
2026
Summer IN PROGRESS

New Washrooms Open (Groundside & Airside)
Expanded washrooms, including a universal washroom with adult changing station.
- New expanded washrooms opening both groundside (before security) and airside (after security).
- Includes a universal washroom with adult changing station — a first at YYG.
- Reflects YYG's commitment to accessible and inclusive travel for all passengers.
- Part of YYG's broader accessibility plan under the ATB Expansion.
Summer IN PROGRESS
2027
Spring COMING SOON

Phase 2/3: New CATSA Pre-Board Screening Area
A modern, expanded security screening experience is on the way.
- Rotation and expansion of the pre-board screening and CATSA queuing area.
- Designed to significantly reduce congestion during peak departure periods.
- Beautiful new wood slat ceiling feature and expanded screening lanes.
- Coming in fall/winter 2026.
Spring COMING SOON
2027
Spring COMING SOON

Phase 2/3: New Departure Lounge & Gates Open
The new heart of YYG — where every departure begins.
- Expanded departure lounge with floor-to-ceiling windows overlooking the airfield.
- Increase from existing gates to 5 gates with vestibule and canopy for boarding.
- New Budley's On the Fly and retail/concessions space within the departure lounge.
- Suspended red paper airplane art installation as a signature design feature.
- New gate areas with modern seating and digital information displays.
Spring COMING SOON
2027
June COMING SOON

Project Complete — A New Chapter for YYG
The full vision, realized.
- Full ATB Expansion project completion target: June 2027.
- A modern, world-class regional airport built for the future of Prince Edward Island.
- Increased terminal capacity, modernized passenger flow, and a passenger experience that reflects the warmth and beauty of PEI.
- A $44 million investment in the communities, businesses, and travellers who depend on YYG every day.
June COMING SOON
A New Chapter.
- A STRONGER CONNECTION -
The best is still to come. Phases 2 and 3 of the ATB Expansion will transform the departure experience at YYG. With a new security screening area, an expanded departure lounge, five boarding gates, a new Budley's On the Fly food and beverage concept, and retail space that reflects the best of what PEI has to offer. We are building an airport that feels like home from the moment you arrive to the moment you take off.